Nothing's in my cart
-
1.0 Fall Protection
-
1.1 Lesson Selection (Main Hub)
-
1.2 Lesson One - Gear Selection
-
1.3 Lesson Two - Training Room
-
1.4 Lesson Three - Equipment Retrieval
-
-
2.0 Confined Space
-
2.1 Lesson Selection (Main Hub)
-
2.2 Lesson One - Gear Selection
-
2.3 Lesson Two - Training Room
-
2.4 Lesson Three - Gas Leak
-
-
3.0 Lockout Tagout (LoTo)
-
3.1 Lesson Selection (Main Hub)
-
3.2 Lesson One - Gear Selection
-
3.3 Lesson Two - Training Room
- About Training Room
- Setup 1: Select all equipment needing LoTo - Part 1
- Setup 2: Select all equipment that needs LoTo - Part 2
- Setup 3: Select all equipment that needs LoTo - Part 3
- Setup 4: Radio to notify affected workers
- Setup 5: Apply and remove LoTo - Circuit Breaker Switch and Valve
- Setup 6: Release residual energy and verify
- Scoring
-
3.4 Lesson Three - Factory Site
- About Factory Site
- Step 1: Use Radio to Notify Affected Employees
- Step 2: Turn off the Power Switch, and Turn off Circuit Breaker Switch 3, then LoTo
- Step 3: Confirm Electrical Power Source Is Turned off
- Step 4: Release any Residual Energy
- Step 5: Services the Pump with the Wrench
- Step 6: Remove LoTo, and Open Main and Residual Pressure Valve
- Step 7: Remove LoTo and Turn on Circuit Breaker Switch 3
- Step 8: Notify Coworkers that Work Is Done
- Step 9: Power on the Pump
- Scoring
-
- Contact Us
Step 8: Notify Coworkers that Work Is Done
After servicing the pump, the trainee should use the radio to notify coworkers that work is done by pressing
NOTIFY on the radio.
Putting Pump 3 back in service.
If trainee does not notify affected coworkers that the pump has been serviced, they will receive a BAD grade for Notified co-workers.