Nothing's in my cart
-
1.0 Fall Protection
-
1.1 Lesson Selection (Main Hub)
-
1.2 Lesson One - Gear Selection
-
1.3 Lesson Two - Training Room
-
1.4 Lesson Three - Equipment Retrieval
-
-
2.0 Confined Space
-
2.1 Lesson Selection (Main Hub)
-
2.2 Lesson One - Gear Selection
-
2.3 Lesson Two - Training Room
-
2.4 Lesson Three - Gas Leak
-
-
3.0 Lockout Tagout (LoTo)
-
3.1 Lesson Selection (Main Hub)
-
3.2 Lesson One - Gear Selection
-
3.3 Lesson Two - Training Room
- About Training Room
- Setup 1: Select all equipment needing LoTo - Part 1
- Setup 2: Select all equipment that needs LoTo - Part 2
- Setup 3: Select all equipment that needs LoTo - Part 3
- Setup 4: Radio to notify affected workers
- Setup 5: Apply and remove LoTo - Circuit Breaker Switch and Valve
- Setup 6: Release residual energy and verify
- Scoring
-
3.4 Lesson Three - Factory Site
- About Factory Site
- Step 1: Use Radio to Notify Affected Employees
- Step 2: Turn off the Power Switch, and Turn off Circuit Breaker Switch 3, then LoTo
- Step 3: Confirm Electrical Power Source Is Turned off
- Step 4: Release any Residual Energy
- Step 5: Services the Pump with the Wrench
- Step 6: Remove LoTo, and Open Main and Residual Pressure Valve
- Step 7: Remove LoTo and Turn on Circuit Breaker Switch 3
- Step 8: Notify Coworkers that Work Is Done
- Step 9: Power on the Pump
- Scoring
-
- Contact Us
Setup 5: Apply and remove LoTo - Circuit Breaker Switch and Valve
In this setup, the trainee will practice applying and removing locks and tags to a switch and a valve.
The trainee starts in a room with the console in front of them, a circuit panel to their left with a switch and a valve.
The cabinet behind them has the following:
- 2 tags
- 2 valve locks
- 2 switch locks
The circuit breaker switch starts in the ON position, and the valve is open.
The following appears on the console screen:
Toggle off the circuit breaker switch on the panel by touching them and squeezing your index finger. Close the valve using the same action.
Switch Off appears above the switch in blue, and Close appears above the valve. The trainee must approach each, reach with their hands, and press the trigger.
After the trainee has switched off the switch and closed the valve, the following will appear on the console screen:
Open the cabinet and take appropriate locks, then put them on the circuit breaker switch and the valve. After locking each item, take 2 tags and put it on both locks.
The trainee must get a switch lock from the cabinet and place it on the switch, and then a valve lock and place it on the valve. Once done, they must get 2 tags from the cabinet and place one each on the switch and valve.
The following appears on the console screen:
Good job! You have successfully locked and tagged 2 power sources. Remove the tags and locks. You can put them back in the cabinet.
The trainee must then remove both locks and both tags. The setup is complete once the trainee removes the last tag.
The setup is successful if both objects have been locked after being turned off/closed, and then unlocked again.
If any object is locked while on or open, the setup will be marked as failed.
Was this helpful?
Yes
No
Submit
Thank you! Your feedback helps others to see the most helpful information.