                            1.0 Fall Protection
- 
                                    1.1 Lesson Selection (Main Hub)
 
- 
                                    1.2 Lesson One - Gear Selection
 
- 
                                    1.3 Lesson Two - Training Room
 
- 
                                    1.4 Lesson Three - Equipment Retrieval
 
 - 
                                    
 - 
            
                
                    
                        
                            2.0 Confined Space
- 
                                    2.1 Lesson Selection (Main Hub)
 
- 
                                    2.2 Lesson One - Gear Selection
 
- 
                                    2.3 Lesson Two - Training Room
 
- 
                                    2.4 Lesson Three - Gas Leak
 
 - 
                                    
 - 
            
                
                    
                        
                            3.0 Lockout Tagout (LoTo)
- 
                                    3.1 Lesson Selection (Main Hub)
 
- 
                                    3.2 Lesson One - Gear Selection
 
- 
                                    3.3 Lesson Two - Training Room
- About Training Room
 - Setup 1: Select all equipment needing LoTo - Part 1
 - Setup 2: Select all equipment that needs LoTo - Part 2
 - Setup 3: Select all equipment that needs LoTo - Part 3
 - Setup 4: Radio to notify affected workers
 - Setup 5: Apply and remove LoTo - Circuit Breaker Switch and Valve
 - Setup 6: Release residual energy and verify
 - Scoring
 
 
- 
                                    3.4 Lesson Three - Factory Site
- About Factory Site
 - Step 1: Use Radio to Notify Affected Employees
 - Step 2: Turn off the Power Switch, and Turn off Circuit Breaker Switch 3, then LoTo
 - Step 3: Confirm Electrical Power Source Is Turned off
 - Step 4: Release any Residual Energy
 - Step 5: Services the Pump with the Wrench
 - Step 6: Remove LoTo, and Open Main and Residual Pressure Valve
 - Step 7: Remove LoTo and Turn on Circuit Breaker Switch 3
 - Step 8: Notify Coworkers that Work Is Done
 - Step 9: Power on the Pump